03. Ecoduct, motorway D11, Chýšť - Osičky
Buried reinforced concrete frame for the above-regional bio-corridor over motorway D11. The bridge is shaped by the composite arch axis. The structure is optically lightened by openings under the bridge in the pier wall.
| Designer: | Valbek spol. s r.o., branch Karlovy Vary |
|---|---|
| Owner: | ŘSD ČR, správa Praha |
| The total cost of construction: | 100 mil. CZK |
| Start of construction: | 2005 |
| End of construction: | 2007 |



