Home page » References » Bridge engineering » Bridges » 08. Railroad bridge over labe in Lovosice, rehabilitation

08. Railroad bridge over labe in Lovosice, rehabilitation

Obrázek

After the flooding in 2002 the bridge owner decided to rehabilitate the substructure of the above described bridge. The
substructure is comprised of high quality sand stone on the rim and the main body is filled with concrete and quarry stone. The
proposed rehabilitation aimed at improving the substructure.

Designer:Valbek, spo. s r.o., branch Ústí nad Labem
Owner: SŽDC
Contractor:Chládek a Tintěra, a.s.

« Back



Powered by CMS Trilobit | Web created by DYNWEB + 17e (graphics)